Studies and tests

Entrust your studies and tests to specialists in railway signaling

Exclusively specialized in the field of railway signaling, our experts have a high level of skills to carry out technical studies, configuration and testing of signaling posts.

Expertise recognized by SNCF Réseau

SNIC SIGNALISATION has the qualifications issued by the SNCF for study and testing services.

SIG Telco 13100 Studies

Qualification for signaling studies covering all activity perimeters

SIG 10203 Tests

Qualifications for pre-integration testing services and testing of new signaling installations Post (Platform and site) of computer workstations before integration

Technical Plans

SNIC SIGNALISATION produces technical plans for SNCF projects.

Our experienced agents, from our historical activities of execution studies and parameterization, form a competent and dedicated team.

They ensure the production of technical plans, particularly for ARGOS technology stations.

Execution studies

SNIC SIGNALISATION has the skills and authorizations necessary to produce the execution documents for railway signaling installations.

These studies are conducted on our Gémenos site in compliance with the technical and organizational requirements for the safety of signaling installations.

Setting

As a historic player in the deployment of computerized switching stations in France for over 20 years, we carry out parameterization studies for computerized interlocking systems.

Since 1999, we have participated in the deployment of more than 250 PIPC (Personal Computer) technology switch stations.

Today, our teams cover the needs for developments and adaptations of the settings already in service.

Still alongside SNCF Réseau, we are now deploying the latest switching station technology, called ARGOS.

Tests

Thanks to our experience in PIPC technologies and the new requirements of SNCF Réseau for the deployment of ARGOS stations, we have developed an activity dedicated to testing.

This activity ensures that the configuration and the Technical Plan meet all safety conditions, thus enabling the commissioning of the new switching stations.

The parameter validation activities on PIPC technologies and the new expectations of SNCF Réseau for the deployment of its ARGOS stations have led us to develop an activity dedicated to testing.

This activity ensures that the parameterization and the corresponding technical plan meet all safety conditions, thus enabling the commissioning of the new switching stations.

Our other à la carte services

Supply of equipment

Supervision

Maintaining service

en_GBEnglish (UK)